Kingsbridge Northwest Theatre 4 and Day Procedure Unit
By icon-admin
Healthcare construction new build Theatre 4 and Day Procedure Unit. Anaesthetic Prep Room Adjoining facility rooms with hygiene & infection control measures RQIA sign off achieved
By icon-admin
Healthcare construction new build Theatre 4 and Day Procedure Unit. Anaesthetic Prep Room Adjoining facility rooms with hygiene & infection control measures RQIA sign off achieved
By icon-admin
Healthcare construction within live hospital. Delivered first Laminar flow theatre in private setting NI Created 8 bed ward with ensuite rooms and pharmacy Anti-vibration shock absorption mats installed due to adjoining rail line
By icon-admin
Healthcare construction within live hospital. Delivered twin bed Intensive Care Unit First ICU in private setting NI Adjoining facility rooms with hygiene & infection control measures RQIA sign off achieved
By icon-admin
Healthcare fit-out delivering 12,000 sq ft new endoscopy unit, day procedure unit and CT scanner. Raised access flooring throughout for services Lead lined walls for CT scanner Hygiene clean room facilities Staff offices/canteen & locker rooms RQIA sign off achieved
By icon-admin
Block B Extension delivering 50,000 sq ft of healthcare facilities (Theatre 4 and Wards 4 & 5). Constructed 1 nr Operating Theatre 22 nr patient bedrooms with en-suites 4 bed recovery ward 3 consulting rooms 7 patient pods New café and commercial kitchen New reception area Modern & efficient M&E services RQIA sign off achieved
By icon-admin
Constructed 24,000 sqft warehouse and office admin block Steel portal frame with insulated cladding Super flat floors Dock levellers Goods in concrete yard and 44 space staff car park
By icon-admin
Constructed 30,000 sqft extension to the existing factory Steel portal frame and insulated cladding Fast doors Super flat floors Site works consisted of new 30 bay lorry park and access road with traffic light controls
By icon-admin
Constructed 45,000sqft extension to the existing factory Galvanised steel portal frame Super flat floors Fast doors Resin floors within production areas Created Monster Energy Drink production line and warehousing
By icon-admin
Constructed 35,000sqft extension to the existing factory Steel portal frame with internal crane rails New office and welfare facilities Resin floors and walkways production areas Extensive site works one way system creating 80 parking spaces
By icon-admin
City Centre Fit-Out. Internal demolitions to create new layout Open plan working spaces created Feature wall and ceiling finishes Full install M&E services