Full repairs on 2 nr façades at busy junction within Belfast City Centre. Stone repairs and repointing Deep clean of façade and redecoration Minimal impact on hotel operations during works
By icon-admin
Full repairs on 2 nr façades at busy junction within Belfast City Centre. Stone repairs and repointing Deep clean of façade and redecoration Minimal impact on hotel operations during works
By icon-admin
Restoration of listed buildings throughout school as part of 10 year ‘Schools to the Future’ project Sympathetic stone repairs, repointing and redressing Replace and repoint brickwork Replacement failed windows with Cotswold windows Refurbished 37m tall clock tower Re-roofing and new lead work throughout New lightening protection New rainwater goods
By icon-admin
Construct new amenity pavilion building with changing rooms. Removal of the existing 4 court surface Replacement with new tennis court surfacing and nets Replacement flood lighting
By icon-admin
Replacement of the existing Astro Turf to form a 3G playing surface for Hockey. Replacement goal and sub benches Creation of new all weather pitch
By icon-admin
Creation of new drop off and collection roadway for Springfield PS located in Belfast. New car park created Extensive landscaping and planting Installation of 2mx 2m box culvert to divert river
By icon-admin
Creation of a new 32 pitch caravan site within Glenariff Forest Park. Bulk excavations and cut & fill within forest park Constructed new amenity block 60 space car park 1.5Km of roads Kids play park
By icon-admin
Extension of the existing park and ride facility creating 144nr new spaces. Bulk excavation and placing hardcore New SMA surfacing New lighting & CCTV
By icon-admin
Concrete framed multi-storey car park in Belfast city centre. Completed Hydro blasting to levels 3 & 4 removing and replacing 5000m2 of failed concrete decking Installed 240 galvanic anodes and 13,000 hybrid anodes into the concrete decks and columns Placed 2000m2 of corrosion inhibitor Completed the works placing 5000m2 of elastomeric deck coatings throughout Phased […]
By icon-admin
Creation of new pit for CNC water jet machine to manufacture aeroplane wings. Pit measured 10m wide x 28m long x 3m deep Completed alongside factory operations behind shrink wrapped scaffolding divide Removal of floor slab by saw cutting for no vibrations Installation by our team 6.5m long steel sheet piles to form cofferdam Bulk […]
By icon-admin
Full refurbishment and alterations of an old cinema building to form new church. Mini piling to form lift shaft and extension Zinc roofing Curtain walling Bespoke fitted furniture High quality finishes throughout