Skip to content

Project

York Road Running Repair Workshop

Back to projects

Client

Translink

Location

Belfast City Centre

Date / Duration

60 weeks

Sector

Transport

Scope

Extension to Running Repair Workshop.

  • Installation 450 nr 600 dia CFA piled foundation
  • Placed single pour 550m3 concrete floor with recesses for train maintenance
  • Steel portal frame with insulated cladding
  • Placement of rail track on elevated stubs