Client
Coca Cola
Location
Lisburn
Date / Duration
52 weeks
Sector
Industrial
Scope
Constructed 38,000sqft extension to the existing factory to form new bottling line
- 600mm CFA concrete piled foundations to 14m depths
- Galvanised steel portal frame with insulated cladding envelope
- Extensive fire painting to steel frame throughout
- Super flat floors
- Floors laid to falls with stainless channels in the production areas
- Resin floor within production areas
- Extensive concrete yards created for loading lorries