Skip to content

Project

Coca Cola PET Line Extension

Back to projects

Client

Coca Cola

Location

Lisburn

Date / Duration

52 weeks

Sector

Industrial

Scope

 

Constructed 38,000sqft extension to the existing factory to form new bottling line

 

  • 600mm CFA concrete piled foundations to 14m depths
  • Galvanised steel portal frame with insulated cladding envelope
  • Extensive fire painting to steel frame throughout
  • Super flat floors
  • Floors laid to falls with stainless channels in the production areas
  • Resin floor within production areas
  • Extensive concrete yards created for loading lorries